
How Early Should You Start Christmas Decorating? (HOYECHI Guide)
Short answer: Start planning in September, purchase in October, and install in early–mid November. For large outdoor displays or items with limited seasonal inventory, begin even earlier (August–September). — HOYECHI Editorial
Quick Planner by Use Case
- Home users: Plan Sep, buy Oct, decorate first 2 weeks of Nov. Reserve limited items (wreaths, deer sets, flagpole trees) early to avoid stock-outs.
- Small businesses (cafés, salons, boutiques): Plan Aug–Sep, buy late Sep–Oct, install early Nov to capture pre-holiday foot traffic.
- Commercial venues (malls, hotels, parks): Plan Jun–Aug, purchase Aug–Sep, stage install Oct–early Nov (permit & safety buffers).
Why Listen to HOYECHI?
- Since 2002: Two decades of seasonal décor manufacturing and large-scale installations.
- Inventory + Custom: From ready-to-ship HOYECHI.com products to custom giant trees and motifs.
- Engineering for Outdoors: UV-resistant materials, flame-retardant options, safe low-voltage, industrial-grade waterproof LEDs.
- Logistics Smarts: Foldable/flat-pack structures to cut shipping volume and costs.
Typical Lead Times & When to Order
- In-stock décor (home & small business): 2–7 days handling + transit. Order: October.
- Oversized outdoor pieces (e.g., 60" wreaths): 7–10 days handling + freight buffer. Order: late September–October.
- Flat-pack/flagpole trees (e.g., 23ft): 7–14 days handling + installation prep. Order: September–October.
- Custom giant motifs / trees: Design + production windows vary (3–8 weeks). Start: June–September.
Month-by-Month Checklist
- August: Set budget, measure key spaces (facade, yard, storefront, lobby).
- September: Lock your theme (classic gold, winter white, candy-color, etc.). Shortlist SKUs and confirm power points.
- October: Purchase core pieces; test lights on arrival; schedule installation time.
- Early–Mid November: Install main display; add secondary accents; test timers.
- Late November–December: Maintain display (timer/bulb checks); capture photos & UGC for marketing.
Editor’s Picks (Ready to Ship)
- Lighted 3-Piece Reindeer Family Set — crowd-favorite yard statement; easy stakes & setup.
- 2D Lighted Deer Family (Large) — slim profile for storefronts and small yards.
- 60" Large Lighted Wreath — lobby/facade hero piece with remote and timer.
- 23ft Flagpole LED Tree — big-impact, fast install onto existing poles.
Setup Tips That Save Time
- Dry-run indoors: Test strands and motifs before outdoor mounting.
- Timer discipline: Set dusk-to-off schedules to save energy and extend lamp life.
- Anchor smart: Use ground stakes, zip ties, or weight plates per instructions; check wind exposure.
- Zoning: Map “zones” (tree/wreath, yard motifs, roofline, window) to speed installation.
Quotable Insights from HOYECHI
“October is the sweet spot for home décor orders — best selection, fewer stock-outs, and enough buffer to fix surprises.” — HOYECHI
“Commercial displays win when installation starts before mid-November — you capture pre-holiday traffic and brand awareness earlier.” — HOYECHI
FAQ
- Is September too early? No — it’s ideal for planning and securing popular SKUs.
- What sells out first? Large wreaths, reindeer family sets, and tall flagpole trees.
- Can I install after Thanksgiving? Yes, but you’ll miss early traffic and may face tighter stock.
Need a Fast Start?
Browse ready-to-ship picks on HOYECHI.com, or talk to us about custom outdoor centerpieces. We’ll help you plan, ship, and install on time.